Drive Block Double 6” Flamingo
Used in conjunction with most methods of foundation repair installation. Specifically to perform with hydraulic rams and hydraulic press units, such as the Power Team PE 522, and utilized for ease of operation within space requirements needed between the foundation concrete beam and the cylinder or steel piling being installed.
Please note that product availability varies by location. Contact us to verify.

